Construction Update
Over the last two months the structural arch and frame of the bridge was assembled in the future Horton Landing Park. Over the December 18-20 weekend, the structural frame of the bridge was lifted into place.
Here is a time lapse video of the move:
For more information about the South Bayfront Bridge Project, visit our webpage.